Coggers Cross, Heathfield

6.8kWp DC
9.5kWh Battery Storage

Chalange: High usage, wanting to limit export, multi-roof install

Solution: We designed & proposed a 16 panel system complete with bird protection which utilised the annex and the main house roof. We had to design the cable routes and system layout to monitor the whole site usage with multiple outbuildings and the inverter being positioned on the annex external wall

Installation: The installation was carried out over 2 days with a return visit to finish the main house roof after the roofer had finished

Post installation: Since the system was installed in June 2023

Household consumption 1,598 kWh
PV Generation 1,147 kWh
Grid import 561 kWh

The PV & Battery system has enabled Dean & Victoria’s electricity bill to be reduced by 71% overall since installation in June 2023.